Production Planning + Daily + Delivery System

1. Production Quantity

Total Order (Key in any ONE unit)

Opening Balance (Factory Stock) (Key in any ONE unit)

FCLBAGPCS
Total Order
Covered (Stock + Delivered)
Net Production Required

Up-To-Date Summary

FCLBAGPCS
Factory Balance (On Hand)
Produced (UTD)
Delivered (UTD)
Order Balance to Deliver
Logic: Factory Balance = Opening + Produced − Delivered; Order Balance = Total − Delivered; Net Production = Order Balance − Factory Balance (min 0).

2. Daily Production (Up To Date)

DateMachineFCLBAGPCSAction
Total Produced 0 0 0

3. Delivery Order (Up To Date)

DateFCLBAGPCSAction
Total Delivered 0 0 0

4. Product Specification

5. Material Formulation

Material%Cost / kgStock (kg)

6. Material Requirement Summary

MaterialGross (kg)Stock Used (kg) Net Required (kg)25kg BagsCost
TOTAL0.00

7. Planned Production Time

MachineCycle (sec)CavityEfficiency %

8. Planned vs Actual

PlannedActualVariance
Quantity (PCS)
Time
Status

9. Shift + Machine EPF

DateMachineShiftPlanActualEPF %