Operating Model Cost Calculator
B Mode
Cycle → Monthly Production Qty → Allocate Monthly Labour / Electricity / Fixed → Cost per Unit → Suggested Selling Price
Save
Load
Reset
1) Basic Info
Product
Date
Machine Type
Packaging Type
Carton
Bag
FCL / Pallet / Other
2) Production Capacity (Cycle → Monthly Qty)
Cycle (sec)
Base cycle time per shot
% Cycle Loss
Downtime / delay inside cycle (0–100)
Cavity
Machine Qty
Running Hours / Day
Working Days / Month
Efficiency %
Quality yield / performance (0–100)
Order Quantity (pcs)
Expected Daily Production (pcs/day)
Auto calculated (you can overwrite if needed)
Monthly Qty (Auto – Cycle)
Monthly Qty (From Expected Daily)
Override Monthly Qty (Final)
If >0, it will override final monthly qty for allocation
Allocation rule: Labour / Fixed / Elec divide by
Final Monthly Qty
. Final Monthly Qty = Override (if >0) else Auto (Cycle).
3) Material (M1–M5)
Weight (g) (Inc Runner?)
% Weight Loss
Add loss due to scrap/trim (e.g., 2)
Net Weight (kg/pc)
Note:
You can type any name in Description. % total can be not 100. System will auto-normalize.
M1 Desc
M1 Price (RM/kg)
M1 %
M1 Contrib (RM/kg)
M2 Desc
M2 Price (RM/kg)
M2 %
M2 Contrib (RM/kg)
M3 Desc
M3 Price (RM/kg)
M3 %
M3 Contrib (RM/kg)
M4 Desc
M4 Price (RM/kg)
M4 %
M4 Contrib (RM/kg)
M5 Desc
M5 Price (RM/kg)
M5 %
M5 Contrib (RM/kg)
Blend Price (RM/kg)
Material Cost (RM/unit)
Material % Total
4) Labour (Monthly Pool → Allocate by Final Monthly Qty)
People per shift
Hours per shift
Rate per hour (RM)
Shifts per day (day+night)
Default: ppl × hours × rate × shifts × workingDays
Override Monthly Labour Cost (RM/month)
If checked, it uses this monthly labour pool.
5) Fixed / Electricity (Hourly OR Monthly Override → Allocate by Final Monthly Qty)
Fixed Cost per hour (RM/hr)
Electricity per hour (RM/hr)
FinalMonthlyQty
Labour (RM/month)
Fixed (RM/month)
Elec (RM/month)
Override Fixed (RM/month)
If checked, uses this monthly fixed pool (ignore hourly fixed).
Override Elec (RM/month)
If checked, uses this monthly elec pool (ignore hourly elec).
Labour (RM/unit)
Fixed (RM/unit)
Elec (RM/unit)
6) Packaging & Transport
Packing Qty (pcs per carton/bag)
Carton Cost (RM)
Carton Reused %
Packaging (RM/pc)
For bag packaging, set carton cost = 0.
Transport mode
Direct: Transport per bag
Lorry: per trip
Transport per bag (RM/bag)
pcs per bag
Lorry per trip (RM)
Carton in 1 lorry
Transport (RM/pc)
7) Mold Fee / Testing Mold Fee (Allocate by Mold Life Qty)
Mold Fee (RM)
Testing Mold Fee (RM)
Mold Life Qty (pcs)
Set 0 to ignore mold fee
8) Assembly / Sticker / Cover & Inner
8.1) Assembly / Sticker
Assembly Into A Set (labour RM)
Assembly Into A Set (Qty)
RM / Qty = RM per unit
Sticker only (RM/pc)
8.2) COVER & INNER
Cover (RM/pc)
Cover price per unit
Inner (RM/pc)
Inner price per unit
9) Margin & Results
Divide by Margin (Gross Margin %) — e.g., 30
SellingPrice = CostPerUnit / (1 - Margin%)
Breakdown
RM / unit
Notes
10) Suggest