Operating Model Cost Calculator
B Mode
Cycle → Monthly Production Qty → Allocate Monthly Labour / Electricity / Fixed → Cost per Unit → Suggested Selling Price
1) Basic Info
2) Production Capacity (Cycle → Monthly Qty)
Allocation rule: Labour / Fixed / Elec divide by Final Monthly Qty.
Final Monthly Qty = Override (if >0) else Auto (Cycle).
3) Material (M1–M5)
Note: You can type any name in Description. % total can be not 100. System will auto-normalize.
4) Labour (Monthly Pool → Allocate by Final Monthly Qty)
Default: ppl × hours × rate × shifts × workingDays
5) Fixed / Electricity (Hourly OR Monthly Override → Allocate by Final Monthly Qty)
6) Packaging & Transport
For bag packaging, set carton cost = 0.
7) Mold Fee / Testing Mold Fee (Allocate by Mold Life Qty)
8) Assembly / Sticker
9) Margin & Results
| Breakdown |
RM / unit |
Notes |
10) Suggest