Operating Model Cost Calculator

B Mode Cycle → Monthly Production Qty → Allocate Monthly Labour / Electricity / Fixed → Cost per Unit → Suggested Selling Price

1) Basic Info

2) Production Capacity (Cycle → Monthly Qty)

Base cycle time per shot
Downtime / delay inside cycle (0–100)
Quality yield / performance (0–100)
Auto calculated (you can overwrite if needed)
If >0, it will override final monthly qty for allocation
Allocation rule: Labour / Fixed / Elec divide by Final Monthly Qty. Final Monthly Qty = Override (if >0) else Auto (Cycle).

3) Material (M1–M5)

Add loss due to scrap/trim (e.g., 2)
Note: You can type any name in Description. % total can be not 100. System will auto-normalize.

4) Labour (Monthly Pool → Allocate by Final Monthly Qty)

Default: ppl × hours × rate × shifts × workingDays
If checked, it uses this monthly labour pool.

5) Fixed / Electricity (Hourly OR Monthly Override → Allocate by Final Monthly Qty)

Shows Labour / Fixed / Elec monthly pool
If checked, uses this monthly fixed pool (ignore hourly fixed).
If checked, uses this monthly elec pool (ignore hourly elec).

6) Packaging & Transport

For bag packaging, set carton cost = 0.

7) Mold Fee / Testing Mold Fee (Allocate by Mold Life Qty)

Set 0 to ignore mold fee

8) Assembly / Sticker

RM / Qty = RM per unit

9) Margin & Results

SellingPrice = CostPerUnit / (1 - Margin%)
Breakdown RM / unit Notes

10) Suggest