Operating Model Cost Calculator

B Mode Cycle → Monthly Production Qty → Allocate Monthly Labour / Electricity / Fixed → Cost per Unit → Suggested Selling Price

1) Basic Info

2) Production Capacity (Cycle → Monthly Qty)

Base cycle time per shot
Downtime / delay inside cycle (0–100)
Quality yield / performance (0–100)
Auto calculated (you can overwrite if needed)

3) Material (M1–M5)

Add loss due to scrap/trim (e.g., 2)
Material blend: calculator auto-normalizes M1–M5 % to 100% (if total ≠ 100%).
Material RM/kg % Contrib (RM/kg) Per Unit (RM)

4) Labour (Monthly Pool → Allocate by Monthly Qty)

Default matches: 9p × 11h × RM13/h × 2 shifts
If checked, calculator will use this value instead of shift formula.

5) Fixed / Electricity (Hourly → Monthly Pool → Allocate)

Auto monthly = rate/hr × hours/day × days/month × machineQty
If checked, monthly fixed/elec uses override values (instead of hourly formula).
Allocated by Monthly Production Qty

6) Packaging & Transport

If bag packaging: set cost=0 and reuse=0 if not used.
Used in Direct mode
Used in Direct mode
Used in Lorry mode
Used in Lorry mode

7) Mold Fee / Testing Mold Fee (Allocate by Mold Life Qty)

If unknown, use large number or set 0 to ignore

8) Assembly / Sticker

If you key RM and Qty, it converts to RM/pc

9) Margin & Results

SellingPrice = CostPerUnit / (1 - Margin%)
Breakdown RM / unit Notes

10) Suggest